BSR/RESNET/ICC 380-202x, draft PDS-03 Comments Submitted

The following comments have been submitted:

Comment #1

Page Number: 5.3
Paragraph / Figure / Table / Note: 5.3
Comment Intent: Objection
Comment Type: Technical

Comment:Proposed Change:Strike the following: 2. The total duct leakage is less than 50 CFMcfm (25 L/s) at 25 Pa; or Reason: The Duct Leakage CFM is unknown because a Duct Leakage test has not yet been conducted.